Precision engineering and strategic execution
Expert handling from start to finish
When it comes to moving the extraordinary, precision and expertise make the difference.
The heavy engineering asset HEA LEVIATHAN was carefully prepared and loaded onto MV Zhong Ren 121 for her voyage to Canada. Every step – from technical planning and lifting arrangement to seafastening design – was handled by experienced engineering and project management teams, in cooperation with JSI Alliance, ensuring a smooth and secure operation.
Tailor-made solutions for complex cargo
The project once again highlighted SAL’s ability to deliver tailor-made heavy lift and transport solutions. With meticulous coordination and technical accuracy, the team executed a complex loading sequence that met the highest safety and efficiency standards.
The operation demonstrated how SAL’s engineering capabilities and operational experience come together to handle challenging cargoes with confidence and precision.
Setting standards in heavy lift transport
By combining innovation, reliability, and strategic execution, SAL continues to set benchmarks in the heavy lift and project cargo sector.
This transport stands as another example of how SAL’s integrated teams – supported by the wider JSI Alliance network – ensure that even the most demanding cargo reaches its destination safely and efficiently.